Follow the sun support model: how it works and how to staff it
By Eterna 9 min read
A follow the sun support model hands open cases to the next time zone’s team as each workday ends. Our team for a US residential solar sales company runs data review 24 hours a day, Monday to Friday1. One of its customer success teams works two shifts, 08:00 to 02:00 Mountain Time2. That is long coverage. Follow the sun adds the handover between time zones.
Our subject is the support queue. IT on-call schedules use the same name for a different job.
What does a follow the sun support model mean in practice?
A 2010 paper gives the strict sense. Teams "hand off work at the end of every day from one site to the next"3. Each site works its own daytime. Then it passes the work on.
Writing on the model separates it from 24/7 service4. In a 24/7 service, work goes to whoever is available at that time. Follow the sun depends on daily handoffs between sites4. If you are moving a single queue rather than staffing several sites, begin with how to outsource customer service.
In a 24/7 pool, any free agent takes the next case. In a follow the sun chain, each case has one owner per shift. It changes hands on a schedule.
Coverage grows with each site. In software work, two sites can stretch development time to up to 16 hours, and three to up to 245. A support desk gets the same lift only when the shifts touch. A case keeps moving while your own team is offline.
Why do buyers ask? In Vonage’s 2025 consumer survey, 49% expect 24/7 availability from AI-powered support tools6. The report draws on over 7,000 consumers in 17 markets7. Check your own ticket log too. It shows who writes after hours.
How does a 24-hour day split between a US team and an Indonesian team?
Take a US East Coast company with its own team on a 9 to 5 day. It adds an Indonesian team on two eight-hour shifts.
The Indonesian times below are Western Indonesia Time (WIB), UTC+78. About 80% of Indonesians live there8. Indonesia has no daylight saving time anywhere9. US Eastern time is UTC-5 in standard time (EST) and UTC-4 in daylight time (EDT)10.
| Team and shift | UTC | Indonesia (WIB) | US Eastern, EST | US Eastern, EDT |
|---|---|---|---|---|
| US team, 9 to 5 local | 14:00 to 22:00 in EST, 13:00 to 21:00 in EDT | 21:00 to 05:00 in EST, 20:00 to 04:00 in EDT | 09:00 to 17:00 | 09:00 to 17:00 |
| Indonesian early shift | 22:00 to 06:00 | 05:00 to 13:00 | 17:00 to 01:00 | 18:00 to 02:00 |
| Indonesian late shift | 06:00 to 14:00 | 13:00 to 21:00 | 01:00 to 09:00 | 02:00 to 10:00 |
The table is our own arithmetic.
The EST column shows the US winter. The US team stops at 17:00. The early shift starts at 17:00. The late shift takes over at 01:00. It hands back at 09:00. Three handovers a day, and no gap. The table has no overlap. For a spoken handover, start each shift a little early. Count that time in the staffing sum.
The EDT column shows the US summer. US clocks move. Indonesia stays put. From 09:00 to 10:00, the US team and the late shift both work. From 17:00 to 18:00, nobody does.
The West Coast moves again. Pacific time is UTC-8 in standard time and UTC-7 in daylight time11. A winter 9 to 5 day there is 00:00 to 08:00 WIB.
These shift times are an example. Real shifts follow the client’s hours. We build the shift around your time zone, so your people are online when your customers and partners are.
Australia, New Zealand and Europe share more daytime with a team on WIB. On a 9 to 5 day, Perth shares 7 hours and Sydney 4 to 5. Auckland shares 2 to 3, and London 1 to 2. Our guide to Indonesia time zone overlap has the full table.
Will three teams on a normal day cover 24 hours?
No. In software work, three sites can reach up to 24 hours5. Three support teams on a plain 9 to 5 day fall short.
By our own count, three 9 to 5 teams still leave a gap. Put one team on WIB8, one in London18 and one in New York10. In the northern winter they cover 02:00 to 22:00 UTC. The four hours from 22:00 to 02:00 UTC stay open. That is 17:00 to 21:00 in New York.
In the northern summer the gap grows to five hours. To close it, one team has to start earlier or finish later. The shifts must touch end to end.
What changes when the clocks change?
Indonesia’s clocks never move9. Yours probably do.
In 2026, US daylight saving time ran from March 8 to November 112. UK clocks go forward on the last Sunday in March. They go back on the last Sunday in October13. So the US and the UK do not change on the same day. UK buyers can check how those dates move their shared hours in our page on offshore outsourcing from the UK.
By our calendar count, March 2026 had three weeks with the US on summer time and London not. In 2027 it is two19. Late October added one more. In those weeks, London and New York shared four hours of a 9 to 5 day instead of three.
For the two-team plan in the table, two fixes work for the US summer:
- Move both Indonesian shifts one hour earlier, to 04:00 to 12:00 and 12:00 to 20:00 WIB.
- Or keep the US team on the same UTC hours, which is 10:00 to 18:00 Eastern in summer.
Pick one rule before the team starts. Write every shift in UTC in the schedule, with local time beside it. Review the schedule two weeks before each clock change.
How many people does 24/7 customer support outsourcing need?
Count the hours first. A dedicated team member works 40 hours a week under your direction. One seat that never closes is open 168 hours a week.
| Coverage for one seat | Hours a week | People at 40 hours each |
|---|---|---|
| 24 hours, 7 days | 168 | 4.2 |
| 24 hours, Monday to Friday | 120 | 3 |
| 16 hours, 7 days | 112 | 2.8 |
| 16 hours, Monday to Friday | 80 | 2 |
This is plain arithmetic. Leave, public holidays and sick days come on top. Two people online at once doubles every row.
Most queues are uneven across the day. Pull a month of tickets and count them by hour of arrival. Staff the busy hours first. Then decide what the quiet hours need.
Take one person or a whole team. The customer facing and operations service lists the support roles we staff, including the customer support team lead. A team with Eterna costs up to 75% less than hiring locally. The price depends on the roles and hours, so book a call for a quote.
What breaks at the handover, and how do you prevent it?
A bad handover makes customers repeat themselves. In Zendesk’s CX Trends 2026 report, 74% of consumers are frustrated when they have to repeat information14. And 81% want agents to continue the conversation without backtracking14.
The 2010 paper on software teams puts it this way: "handoff efficiency is paramount to successful FTS practices"15.
Three failures are worth planning for. The first is a case with no owner at shift change. Each team thinks the other has it.
The second is a promise that does not travel. An agent tells a customer "by noon". The note leaves it out.
The third is an escalation that waits. The case needs an engineer, and the next shift finds out late. An IT help desk hands over the same way, and how to outsource IT support sets its ticket targets.
Write a path for each one. Take our support work for a B2B SaaS company that serves door-to-door sales teams. The team answers customer inquiries by phone, email, text message and live chat16. It escalates technical issues to the development team when needed17. A path like that belongs in every handover, so the next shift knows whom to call.
Each Eterna team starts each shift together in its department’s room in our virtual office. There is a short check-in during the shift. Leads know the same day if something needs attention. How we work shows a full day.
What should a handover note hold?
This is our own checklist. It works in any help desk tool. Each shift ends with one note for every open case:
- The case number and the customer.
- What the customer asked, with the last message attached.
- What the customer was told, with any time you promised.
- What was tried, and the result.
- The next action and its due time.
- The owner from now on, and whom to escalate to.
Keep each field to one line. Write it in the ticket itself. Chat messages scroll away by morning.
Which measures show the model works?
Watch five numbers, split by shift:
- Open cases at each handover. A count that grows each day means one shift cannot keep up.
- First reply time for cases that arrive in the last hour of a shift. Cases fall between teams here.
- Cases that change hands more than once. Each extra handover is one more chance to lose context.
- Reopened cases, by the shift that closed them.
- Customers who say they had to repeat themselves. Ask it in your satisfaction survey.
We set no target here. Your queue decides what good looks like. Review the numbers weekly.
People need a weekly check too. With Eterna, your managers rate each team member from 1 to 4 every week. If a score dips, Eterna’s management, HR and training teams step in early.
When is follow the sun the wrong choice?
Skip it when few cases arrive outside your office hours. Your ticket log shows this in an afternoon.
Skip it when all your customers live in one region. They sleep when you do.
Skip it when the work needs one person on a long investigation. A handover halfway through can cost more than the wait.
Skip it when you can fund fewer people than the table needs. A seat that never closes takes 4.2 people before leave.
Smaller plans exist. One team can work extended hours. One person can stay on call for urgent cases. A help center can answer the simple questions after hours.
You still own the rules, whoever runs the shifts. Decide which cases may change hands and which stay with one person.
How do you start with a team in Indonesia?
Answer three questions first. By when must a customer get a first reply? Which cases may change hands between shifts? Who may approve a promise to a customer?
Then tell us the roles you need and how many people on the build your team form. We reply with a team plan by email within 24 hours.
Questions buyers ask
What does follow the sun mean in customer support?
Each team works its own daytime and passes open cases to a team further west. In software research, two sites can stretch development time to up to 16 hours, and three to up to 245. A support desk reaches 24 only when the shifts touch end to end.
Is follow the sun the same as 24/7 support?
Not in the strict sense. A 24/7 service gives work to whoever is available at that time4. Follow the sun passes each case along a chain of sites, with a handoff each day. Ask any provider which of the two it plans to run.
How many people does one round-the-clock seat need?
One seat open 168 hours a week needs 4.2 people at 40 hours each. Leave and holidays come on top. A Monday to Friday seat needs 3. Count your tickets by hour before you staff the quiet hours.
Can a team in Indonesia work my hours?
Yes. Your team works your hours. We build the shift around your time zone, so your people are online when your customers and partners are. Book a call and tell us the hours you need covered.
Sources
- Eterna case study, solar operations (data review hours) eternaindonesia.com
Data Review covers 24 hours a day, Monday to Friday
- Eterna case study, solar operations (customer success shifts) eternaindonesia.com
Two shifts, 08:00 to 02:00 Mountain Time
- Carmel, Espinosa and Dubinsky, "Follow the Sun" workflow in global software development, Journal of Management Information Systems (2010), the definition cris.haifa.ac.il
hand off work at the end of every day from one site to the next, many time zones away
- Wikipedia, Follow-the-sun, on 24/7 service en.wikipedia.org
In this configuration work is distributed to workers who are available at that time. It is focused on availability and the workers have little dependency, whereas FTS is focused on duration reductions and requires dependencies between the different sites in order to perform the daily handoffs
- Wikipedia, Follow-the-sun, on sites and hours en.wikipedia.org
with two sites the development time can increase to up to 16 hours, or up to 24 hours if there are three sites
- Vonage, Global Customer Engagement Report 2025, on AI-powered support tools vonage.com
Customers show clear channel preferences when it comes to AI-powered support tools: 44% prefer messaging apps. 39% prefer website chat. 30% prefer email interactions. 49% expect 24/7 availability.
- Vonage, Global Customer Engagement Report 2025, on the survey vonage.com
Based on insights from over 7,000 consumers surveyed across 17 global markets worldwide
- Wikipedia, Time in Indonesia en.wikipedia.org
About 80% of the Indonesian population live in WIB (UTC+07:00).
- Wikipedia, Time in Indonesia (daylight saving) en.wikipedia.org
the daylight saving time system is not observed anywhere in Indonesia
- Wikipedia, Eastern Time Zone en.wikipedia.org
Eastern Standard Time (EST), which is five hours behind Coordinated Universal Time (UTC-05:00) and observed during late autumn and winter. Eastern Daylight Time (EDT), which is four hours behind Coordinated Universal Time (UTC-04:00) and observed during spring, summer, and early autumn.
- Wikipedia, Pacific Time Zone en.wikipedia.org
Places in this zone observe standard time by subtracting eight hours from Coordinated Universal Time (UTC-08:00). During daylight saving time, a time offset of UTC-07:00 is used instead.
- NIST, Daylight saving time (DST), the 2026 dates nist.gov
During 2026, daylight saving time is in effect from March 8 at 2 a.m. (local time) to November 1 at 2 a.m. (local time).
- GOV.UK, When do the clocks change? gov.uk
In the UK the clocks go forward 1 hour at 1am on the last Sunday in March, and back 1 hour at 2am on the last Sunday in October.
- Zendesk, CX Trends 2026 press release (18 November 2025) zendesk.com
Consumers now expect service that picks up where they left off: 81% want agents to continue the conversation without backtracking, and 74% are frustrated when they have to repeat information.
- Carmel, Espinosa and Dubinsky, "Follow the Sun" workflow in global software development, Journal of Management Information Systems (2010), on handoffs cris.haifa.ac.il
handoff efficiency is paramount to successful FTS practices
- Eterna case study, SaaS customer support (channels) eternaindonesia.com
The team answers customer inquiries by phone, email, text message and live chat
- Eterna case study, SaaS customer support (escalation) eternaindonesia.com
escalates technical issues to the development team when needed
- Wikipedia, Time in the United Kingdom en.wikipedia.org
The United Kingdom uses Greenwich Mean Time (GMT, UTC+00:00) (also known as Western European Time) between October and March, and British Summer Time (BST, UTC+01:00) (also known as Western European Summer Time) for the rest of the year.
- NIST, Daylight saving time (DST), the US rule nist.gov
At present, daylight saving time in the United States begins at 2:00 a.m. on the second Sunday of March

