Skip to the content
Build your team

Architectural drafting services: what to send and what comes back

By Eterna 9 min read

  • Engineering
  • Architectural drafting
  • CAD drafting
  • AEC
  • Outsourcing

With architectural drafting services, you send your standard, a sample set and your markups, and checked sheets come back. Since 2024 we have supplied CAD drafters to a residential solar company, as our solar plan set case study shows.1 The same company gets permitting and utility coordinators, and its sister financing company gets QC and operations specialists from us.1 A drafter draws each sheet, and a QC specialist checks it. A sheet with a fix goes back to the drafter before the permit package is filed.

That proof is solar plan sets. Architectural sets have other sheets. The loop carries over to an architect’s office, or a builder with more drawings than drafters.

What do architectural drafting services include?

The drafter turns your design into sheets. The design stays yours. Solar plan sets follow their own rules, set out in solar permit design outsourcing.

O*NET, the US occupational database, describes the work of architectural and civil drafters. They draw scale plans "based on preliminary concepts, sketches, engineering calculations, specification sheets, and other data."2 Another listed task is to coordinate structural, electrical and mechanical designs into one way of showing building plans.3 Your markups carry the design. The drafter turns them into sheets.

In practice the set holds floor plans, roof plans, sections, elevations, details and schedules. It grows as the project moves.

Your office keeps the client meetings and the code decisions. A good drafter asks about an unclear markup before drawing it. Count those questions in the first week. They tell you who reads your notes.

How are architectural drafting and CAD drafting services different?

CAD drafting is the wider term. It covers any trade.

Our role list shows the split. Architectural drafters and designers work on buildings. Mechanical, electrical and civil drafters each work in their own field, and shop drawing detailers draw for fabrication. Four BIM roles work on models: a BIM specialist, a BIM coordinator, a Revit modeler and a Scan-to-BIM specialist. Our page on AEC outsourcing groups them.

Hiring one drafter is a different job. Our guide on how to hire a remote CAD drafter covers the test task.

What should you send before the first sheet?

Six things. Send them before any drawing starts.

  1. Your drafting standard: layers, line weights, text styles, the title block and the sheet order.
  2. One finished set that passed your review.
  3. The base for this job: sketches, the survey, site markups and the latest specification notes.
  4. The list of sheets you want back.
  5. The stage the set is for.
  6. One person in your office who answers questions the same day.

Remove client names and private details from the sample first. On our side, every Eterna employee signs an NDA before they start on your account. We also sign your own NDA on your terms.

A written standard cuts the questions. In the United States, the National CAD Standard exists to make building design and construction data simpler to exchange.4 If your office works to it, say so in the order. A house style works too. One page is enough to start.

Which stage is the set for, and what comes back?

Name the stage. Labels differ by country and by office.

In the UK, RIBA’s Plan of Work 2020 sorts building projects into eight stages.5 It sets out the outcomes, core tasks and information exchanges at each one.5 Your office may use other names. Use the labels your team already knows, and write them into the order.

Models carry a second label. The BIM Forum publishes a Level of Development (LOD) specification. It does not say which level a project must reach at which point. It "leaves the specification of the model progression to the user of this document."6 So the LOD for each model belongs in your order, in your words.

Use this table as a starting order. Each cell is a term to agree in writing with any provider.

JobYou sendYou get backWho checksFiles
Concept sheetsSketches, the survey, the briefPlans and elevations to scaleThe drafter, a second reviewer, then youNative file and PDF
Design development setThe concept set with your markups, consultant notesPlans, sections, elevations and key detailsThe drafter, a second reviewer, then youNative file, PDF, IFC if a model exists
Construction document setThe approved design set, specification notes, consultant drawingsThe full sheet set with details and schedulesThe drafter, a second reviewer, then you before issueNative file, PDF set, sheet index
As-built updateSite markups, photos and redlinesSheets updated to match the built workThe drafter, a second reviewer, then youNative file, PDF, revision log
Revision roundOne markup list for the roundChanged sheets only, clouded, with a new revision numberThe drafter, a second reviewer, then youNative file, PDF, updated revision log

Fill in the names before work starts. A blank "Who checks" cell means the drafter checks alone.

Who checks a drawing before it reaches you?

A second person on the provider side. Then you.

On our solar plan sets, a QC specialist checks each sheet, and senior QA checks every set. Our role list also has a Plan reviewer for this step. Ask any provider for the name of the person who checks your sheets. A job title is not an answer. The wider picture of outsourcing to Indonesia covers hours and hiring routes.

The last check stays with your office. You accept each set before issue, so put your own review into the schedule.

Then the stamp. We make no claim of a stamp or a seal. In the US, NCARB says: "Each state has a different set of rules for practicing architecture."7 Outside the US, ask your own registration board what applies to your project.

How do revision rounds work?

Write the rule down first. This is our advice for any provider.

  1. Fix how many rounds each set includes.
  2. Send one consolidated markup list per round, from one person.
  3. Set a return date for each round.
  4. Name who decides when a change counts as new scope.

Agree the round count and the return dates on the call. Then put both in the order.

Decide how a fix travels, too. For a US-based solar EPC company, our reviewer writes revision notes when a plan set needs changes. The reviewer makes the change directly when that is faster or more practical. The solar EPC case study has more. Pick one way for your sheets.

Then measure. Count two things per sheet: the corrections you sent, and the errors that came back a second time. Corrections should fall with each set. A repeat error points to an unclear standard, so fix the standard before you add more sheets.

What files should you get back?

Ask for the files at every issue. A set held back until the end of the job is a set you can lose. An estimator downstream can then order quantity takeoff services from the same set.

  1. Native files: DWG for CAD sheets, RVT for a Revit model, or the format your office uses.
  2. A PDF set for each issue, with the issue date on every sheet.
  3. A sheet index and a revision log.
  4. An IFC export if a model exists.
  5. Any new blocks, families or templates made for the job.

IFC is an open, global standard, published as ISO 16739. Its standards body calls it vendor-neutral.8 Ask for it when your consultants work in other software.

Keep one folder and one naming rule. Name one person who may overwrite files. Everything your team produces is your property as work-for-hire.

Should you outsource architectural drafting to one drafter, a team or a project?

Start with how many sheets you draw.

A local drafter can walk the site and may know your permit office. A freelancer from a marketplace can turn around one small set for a one-off job. For a single house plan, either may fit you better than a remote team. A remote team also does not fit an office with no written standard and nobody to answer questions. Write the standard first.

Ongoing work suits a dedicated team. Full-time people who work only for you, managed by Eterna. They work 40 hours a week under your direction. You interview and approve every person before they join. For a set with a clear end, we scope a project on a call.

Can you start with one person? Yes. Take one person or a whole team, or hand us a project with a clear scope.

A team can start in about a month. In week 1 we define the role, the tools, the hours and the outcomes you want. In week 2 you meet pre-vetted candidates and approve every hire. In weeks 2 to 3 they learn your tasks, tools and SOPs, with your sign-off. In week 4 they work in your systems. Our engineering service lists the roles.

Why build a drafting team in Indonesia?

In Indonesia this industry is young, so Eterna gets first pick of the country’s best people. Eterna is the #1 and largest BPO in Indonesia.

About 18,000 people apply to Eterna each year. We accept about 0.5%, fewer than 1 in 100. Every applicant goes through a first screening before any interview. Then we interview on six points: general competency, culture fit with your company, technical skill, experience, professionalism and English communication. Only people who pass every step are offered to you. You run your own interview, so set one test sheet on your own template.

Turnover is under 5% across the company. How we work has the full steps.

Your team works your hours. We build the shift around your time zone, so your people are online when your customers and partners are. Our guide to Indonesia time zone overlap counts the shared hours by city.

What does an outsourced drafting team cost?

A team with Eterna costs up to 75% less than hiring locally. Our clients say so. So does our own research. The price depends on the roles and hours. So we quote on a call. Ask every provider how it charges, by the set or for a full-time person. Then compare like with like.

How do you start?

Pick one finished set from a past job and remove the private details. Write your drafting standard on one page. Then book a call and bring both, and we will scope your first set with you.

Questions buyers ask

Can one provider cover CAD drafting services for every trade?

Ask for the role list. Ours has architectural, mechanical, electrical and civil drafters, plus shop drawing detailers and BIM roles. Name the trade and the sheet types in your order. Then test one sheet before you send a full set.

What should I send an architectural drafter first?

Your drafting standard, one finished set that passed your review, and the base drawings with your markups. Add the sheet list, the stage of the set and one contact who answers the same day. Remove private details first.

How many revision rounds should an order include?

With any provider, fix the count per set before work starts. Send one markup list per round, with a return date for each. Raise the rounds on the call, and get them in the order.

Can an outside drafting team stamp my drawings?

We make no claim of a stamp or a seal. Our drafters draw sheets to your standard, and you accept each set. For the rules on your project, ask your own licensing board.

Who owns the drawings?

With an Eterna team, you do. Everything your team produces is your property as work-for-hire. Every Eterna employee signs an NDA before they start on your account. We also sign your own NDA on your terms.

Sources

  1. Eterna case study, CAD drafters, permit and utility coordinators and QC specialists eternaindonesia.comSince 2024, Eterna has supplied Palmetto with CAD drafters, permitting coordinators and utility coordinators, and LightReach with QC and operations specialists.
  2. O*NET OnLine, Architectural and Civil Drafters (US Department of Labor, updated 2026) onetonline.orgDraw rough and detailed scale plans for foundations, buildings, and structures, based on preliminary concepts, sketches, engineering calculations, specification sheets, and other data.
  3. O*NET OnLine, Architectural and Civil Drafters, task on coordination (US Department of Labor, updated 2026) onetonline.orgCoordinate structural, electrical, and mechanical designs and determine a method of presentation to graphically represent building plans.
  4. United States National CAD Standard, National Institute of Building Sciences (a definition of the standard) nationalcadstandard.orgThe United States National CAD Standard (NCS) streamlines and simplifies the exchange of building design and construction data from project development throughout the life of a facility.
  5. RIBA, Plan of Work 2020 (a definition of the staging) architecture.comThis key suite of documents organise the process of briefing, designing, constructing and operating building projects into eight stages and explain the stage outcomes, core tasks and information exchanges required at each stage.
  6. BIM Forum, Level of Development (LOD) Specification, LOD Spec 2025 (page dated 31 Dec 2024) bimforum.orgIt does not prescribe what Levels of Development are to be reached at what point in a project but leaves the specification of the model progression to the user of this document.
  7. NCARB, Become an Architect, licensing requirements tool (2026) ncarb.orgEach state has a different set of rules for practicing architecture. Find out what your state requires!
  8. buildingSMART International, Industry Foundation Classes (IFC), ISO 16739-1:2024 buildingsmart.orgIt is an open, global standard published under a Creative Commons license, and as ISO 16739. IFC provides machine interpretability of information and thereby enables automation of workflows. It is vendor-neutral and available to everyone.

Blog

More articles.

  1. How to hire a remote CAD drafter: test real work, hand over your standard

    Hire a remote CAD drafter: what to test before you say yes, what to hand over on day one and how review keeps drawings right.

    • Engineering
    • CAD drafting
    • Hiring
    • Remote teams

    6 min readGlobal

  2. Solar permit design outsourcing: a checklist for installers

    Solar permit design outsourcing for installers: what to hand over, what a plan set holds and how to check each set before you file.

    • Solar
    • Permitting
    • Engineering
    • Plan sets
    • Outsourcing

    9 min readUnited States

  3. Quantity takeoff services: what you send and what you get back

    Quantity takeoff services explained: which drawings to send, what quantities come back, and how to check the work before your estimator prices the job.

    • Quantity takeoff
    • Construction estimating
    • Engineering outsourcing
    • AEC
    • Estimators

    8 min readUnited States

All articles

Next step

Talk to us about your team.

Tell us the roles you need, or book a 30-minute call. We reply with a team plan by email within 24 hours.

Before you go

Get a team plan by email.

Tell us the roles and how many people you need. We reply within 24 hours with a team plan. Or pick a time and talk it through with us.