Skip to the content
Build your team

Quantity takeoff services: what you send and what you get back

By Eterna 8 min read

  • Quantity takeoff
  • Construction estimating
  • Engineering outsourcing
  • AEC
  • Estimators

Quantity takeoff services take your drawings, specifications and bid scope, and send back quantities by trade for your estimator. Our specialists review electrical interconnection methods, structural information and plansets for a US-based solar EPC (engineering, procurement and construction) company. They do it before installation. That work is plan review. We have no published takeoff case study. So we claim no takeoff speed or accuracy here. The steps work with any provider.

What is a quantity takeoff, and how does it differ from an estimate?

A takeoff lists all the materials and items of work that a project’s construction documents require, with no prices yet.1 Prices come next. With prices added, the measured quantities give the direct cost, and indirect costs and profit bring it to a total.2

So the service counts and your estimator prices. Some providers do both, so ask which one you are buying.

O*NET, a US job database, says cost estimators analyze blueprints and documents to prepare time, cost, materials and labor estimates.3 The measuring can move to another desk. The pricing judgment stays with you.

Ask for the takeoff file too. In cost estimating, the supporting documents can include quantity takeoffs, methodology, vendor quotes and cost assumptions.4 A bare total cannot be checked.

What should I put in a takeoff request?

A thin request makes a thin takeoff. The provider counts what it was sent, so a missing addendum means its quantities are missing from the bid too. If drawings are still in progress, architectural drafting services come first.

Send these with every request:

  1. The full drawing set, current revision.
  2. The specifications and every addendum.
  3. The bid scope: trades in, trades out.
  4. Your cost codes or division order, and the unit you want for each line.
  5. Your waste rule, or "net quantities only".
  6. The due date, and one person who answers questions before it.
  7. Your tolerance for the first check, agreed before any work starts.

Name your measurement rules too. RICS says its NRM suite gives "a standard set of measurement rules" for the cost management of construction projects.6 NRM 2 covers detailed measurement for building works,7 so if you price to it, say so in the request. For US work, name every unit. For metric work, ask for cubic meters and square meters on the same lines.

Then fix the order of the lines. MasterFormat gives a master list of divisions, with sections inside each one, to organize a facility’s construction requirements and activities.8 If your cost codes follow it, ask for that order, so each line lands where your estimate expects it.

Have a building model? Send it too. Say which version matches the drawings. A building information model can hold the quantities and properties of building components.9 We would still check model quantities against the issued sheets, because a model and a drawing set can drift apart.

What does a finished takeoff look like?

A sheet you can audit. Each line names the item, its quantity and unit, and the plan sheet and detail that it came from.

The rows below are ordinary estimating practice for a building job, so change the trades to fit your scope.

TradeWhat is countedUsual unitOne quick check
ConcreteSlabs, footings, wallsCubic yardsRecompute one pour from the structural sheet
Framing and drywallWall length by wall typeLinear feet, square feetMeasure the walls on one floor plan
RoofingRoof areas by slopeSquaresCompare with the roof plan area
Doors and windowsOpenings by typeEachCount against the door and window schedules
ElectricalDevices, fixtures, panelsEachCount fixtures against the lighting schedule
PlumbingFixtures, pipe runsEach, linear feetCount fixtures against the plumbing schedule

Ask for a marked-up set too, with every counted item tagged. A missed item is easy to see. It is the one with no mark.

Get net quantities first, with waste in its own column. Your waste factor is a pricing decision. It belongs to your estimator.

The file should also carry a list of open questions, such as a detail that conflicts with a schedule. An unnamed scope item belongs there too. Read those questions first.

Agree how questions travel before the first set goes out. One shared log beats a long email thread. Each question names the sheet, the detail and the item. Your answer goes in the same row, with the date. On bid day, that log shows what was assumed and who decided it.

How do I check a takeoff before I bid on it?

Our advice, whoever does the counting, is to test the first return against a job you already know well.

A US government guide on cost estimating says a cost estimate is built "using established methods and valid data".5 It was written for government programs. The idea fits a bid too. You trust a quantity once you can trace it and test it.

The test takes one old job and one live bid.

  1. Pick a job you know well.
  2. Send its drawings with the same request you would send for a live bid.
  3. Compare the totals by trade with your own final numbers. Start with the trades you know cold.
  4. For each gap, ask which sheet and detail the count came from.
  5. Repeat on one live bid, with your estimator recounting two trades in full.

Count an untraced line as a miss. Set your tolerance for each trade before the test starts, and write it into the request you send the provider. Then the result cannot move the target.

Keep checking after the test. Recount two trades on every live bid at first, and check fewer lines once the gaps stay inside your tolerance.

Where does my estimator still decide the price?

Everything after the count. Your estimator adds the prices to reach the direct cost, then adds indirect costs and profit for the total.2

A takeoff cannot see the site. It does not know your crews or your suppliers, and it cannot tell which exclusion will win the job. Those calls are yours.

Some jobs do not suit a takeoff service. Repair work priced from a site walk gives it little to measure, and so does design-build work before drawings exist. A takeoff service also fails when nobody on your side answers its open questions before the bid is due.

When does construction estimating outsourcing make sense?

When counting holds up pricing. If your estimators spend most of their week measuring, they price fewer bids and turn down more invitations to bid. Move the count first. Who runs the count, you or a provider, is the core of offshoring vs outsourcing.

OptionWhat it does wellWhat to watch
Your own estimatorKnows your crews, suppliers and past jobsMeasuring hours come out of pricing hours
A per-job takeoff firmTakes one bid package with no hireAsk whether the same person takes each of your jobs
A dedicated remote takeoff specialistLearns your cost codes and standards over timeNeeds a steady flow of bids and a manager on your side

Takeoff software works inside all three, and it measures from paper or electronic plans.10 A person still runs it, so the same checks apply.

Outsourcing estimating fits best when the drawings are complete, the scope is written down and the bids keep coming.

The flow of bids also decides the model. A dedicated person suits a steady flow, because they learn your cost codes once. A project suits one large bid package with a clear scope. If you are unsure, start with one person. Add a second person once the returns hold up on live bids.

How does Eterna staff a takeoff team?

Our engineering roles include construction estimator, quantity takeoff specialist, AI takeoff specialist and bid coordinator. You can see them on our engineering service page and our AEC industry page.

There are two ways to work. A dedicated team is full-time people who work only for you, managed by Eterna. Each person works 40 hours a week under your direction. Take one person or a whole team, or hand us a project with a clear scope. The first is a form of offshore staffing.

You interview and approve every person before they join. About 18,000 people apply to Eterna each year. We accept about 0.5%, fewer than 1 in 100. A dedicated team can start in about a month.

For clients in the United States, our teams work shifts aligned to US business hours. The team works in your systems. If you run something we have not seen, we build a learning module for it.

Drawings carry your clients' details. Every Eterna employee signs an NDA before they start on your account. We also sign your own NDA on your terms. Everything your team produces is your property as work-for-hire.

Each week your manager rates each team member from 1 to 4. If a score dips, Eterna’s management, HR and training teams step in early. How we work shows a full week. If you also need drawings, read our guide to hiring a remote CAD drafter.

Eterna is an international company, headquartered in Indonesia, with a US entity and a fully remote team. The price depends on the roles and hours, so book a call for a quote. A team with Eterna costs up to 75% less than hiring locally.

How do I start?

List the trades that slow your bids. Then tell us the roles you need and how many people. We reply with a team plan by email within 24 hours.

Questions buyers ask

Will a takeoff provider price my job too?

If you ask, some will. A pure takeoff stops at quantities. Prices, indirect costs and profit come after the count.2 Say in writing which one you are buying, so nobody prices a job twice or not at all.

Can a takeoff come from my building model?

When the model matches the issued drawings, it can. A building model can hold the quantities of its components.9 Ask which model version was used, and recount two trades from the sheets before you rely on it.

How do I know the quantities are right?

Test the provider on a job you already built. Compare the totals by trade with your own numbers. Ask where each gap came from. A sound return lets you trace every line to a sheet and a detail.

Can I start with one person?

Yes. Take one person or a whole team, or hand us a project with a clear scope. You interview and approve every person before they join. A dedicated team can start in about a month.

How much does a takeoff team cost?

The price depends on the roles and hours, so book a call for a quote. A team with Eterna costs up to 75% less than hiring locally. Ask any provider to quote the same scope, so you compare like with like.

Sources

  1. Wikipedia, Construction estimating software (takeoff defined) en.wikipedia.orga listing of all the materials and items of work required for a construction project by the construction documents
  2. Wikipedia, Construction estimating software (direct cost, indirect costs and profit) en.wikipedia.orgTogether with prices for these components, the measured quantities are the basis for calculation of the direct cost. Indirect costs and profit are added to arrive at a total amount.
  3. O*NET OnLine, Cost Estimators, task list onetonline.orgAnalyze blueprints and other documentation to prepare time, cost, materials, and labor estimates.
  4. Wikipedia, Cost estimate (supporting documents) en.wikipedia.orgSupporting documents may include quantity takeoffs, methodology, vendor quotes, and cost assumptions.
  5. US Government Accountability Office, Cost Estimating and Assessment Guide (GAO-20-195G) gao.gova cost estimate is the summation of individual cost elements, using established methods and valid data, to estimate the future costs of a program, based on what is known today.
  6. RICS, NRM, New Rules of Measurement rics.orgNRM provides a standard set of measurement rules and essential guidance for the cost management of construction projects and maintenance works.
  7. RICS, NRM, New Rules of Measurement (NRM 2) rics.orgNRM 2: Detailed measurement for building works
  8. Wikipedia, MasterFormat en.wikipedia.orgIt provides a master list of Divisions, and Sections within each Division, to organize information about a facility's construction requirements and associated activities.
  9. Wikipedia, Building information modeling en.wikipedia.orgIt also covers spatial relationships, geospatial information, quantities and properties of building components
  10. Wikipedia, Construction estimating software (takeoff software) en.wikipedia.orgTakeoff software - this provides for measurement from paper or electronic plans.

Blog

More articles.

  1. Architectural drafting services: what to send and what comes back

    Architectural drafting services explained: what to send, what comes back at each stage, who checks it, and how revisions and files are handed over.

    • Engineering
    • Architectural drafting
    • CAD drafting
    • AEC
    • Outsourcing

    9 min readGlobal

  2. Solar permit design outsourcing: a checklist for installers

    Solar permit design outsourcing for installers: what to hand over, what a plan set holds and how to check each set before you file.

    • Solar
    • Permitting
    • Engineering
    • Plan sets
    • Outsourcing

    9 min readUnited States

  3. How to hire a remote CAD drafter: test real work, hand over your standard

    Hire a remote CAD drafter: what to test before you say yes, what to hand over on day one and how review keeps drawings right.

    • Engineering
    • CAD drafting
    • Hiring
    • Remote teams

    6 min readGlobal

All articles

Next step

Talk to us about your team.

Tell us the roles you need, or book a 30-minute call. We reply with a team plan by email within 24 hours.

Before you go

Get a team plan by email.

Tell us the roles and how many people you need. We reply within 24 hours with a team plan. Or pick a time and talk it through with us.