Solar permit design outsourcing: a checklist for installers

By Eterna 9 min read

  • Solar
  • Permitting
  • Engineering
  • Plan sets
  • Outsourcing

Solar permit design outsourcing works when you give designers your site data, your template and each permit office’s rules. Since 2024, we have supplied CAD drafters, permitting coordinators and utility coordinators to a residential solar company.19 On our engineering teams, a drafter draws each sheet and a QC specialist checks it.20 A sheet with a fix goes back to the drafter before the permit package is filed.20

This checklist is for a US installer or EPC company whose permit sets wait on one designer. We are headquartered in Indonesia, with a fully remote team. We sell this service. Test our advice on any provider. Hold us to it too.

What does solar permit design outsourcing cover?

An outside designer draws the plan set. The designer also answers review comments. You keep what carries your name. Those are the site data, the final check and the engineer’s stamp, where one is needed.

Filing is a scope question. Some providers draw only. Others also file and track the permit. Write the split down as named deliverables. Ask whether site surveys and utility applications are in or out.

Why bother? Delay costs money. The National Laboratory of the Rockies (NLR) says nonequipment soft costs such as permitting, inspection, and interconnection "remain stubbornly high".2 It adds that review and approval across the 20,000 distinct jurisdictions and 3,000 utilities can sometimes add weeks or months.1 A rejected set rejoins that queue. Our reading: catch errors before filing.

What goes into a solar permit plan set?

The answer starts at the permit office. AHJ stands for the authority having jurisdiction. That office reviews your plans. A Penn State course on commercial solar systems says local municipalities "have final jurisdiction and authority for projects".8

Each one asks for its own bundle. NLR’s permitting training puts it plainly: "AHJs collect different information to complete plan review."3 Some communities require a three-line diagram or schematics, a site plan and equipment cut sheets.3 Building plans for other trades are covered in architectural drafting services.

The same course lists what a design package may include:910

  • a site view with the interconnection point
  • one-line and three-line electrical drawings
  • the structural design and its loads
  • warning signs and labels
  • a bill of materials
  • spec sheets for the main components
  • engineer stamps, "if needed"

Electrical work answers to the National Electrical Code (NEC), which AHJs enforce.5 NLR’s training lists "NEC Article 690, 705, and Chapters 1-4" among the key codes for plan review.6 Ask each office which edition it enforces. Write the answer down.

Who sets the rules: the permit office or the utility?

Both, on different sheets. Penn State’s course names three askers: "The city, utility, or AHJ might request a design package".9 The permit office enforces its codes, the NEC among them.5 The utility sets its own interconnection rules.

Reviewers also read code differently. NLR notes that "Variations in code interpretation and enforcement may result in plan review personnel requesting specific design modifications".4 A correct set can still come back.

So a provider’s record in one city says little about yours. SurgePV, a solar design software vendor, agrees. In its words, coverage at one AHJ "does not prove coverage at another, even within the same state."11

Our answer is one page per office. Write a rules sheet for each permit office and each utility you file with. Put the code edition on it. Add the sheet order, fire access notes, label wording and the comments from your last rejection. Update it after every comment.

Some offices allow a check first. The US Department of Energy says its SolarAPP+ tool "allows developers to check code compliance of designs before submitting them".7 Ask your office whether it uses it.

The utility has its own filings. For a California residential solar company, our team files for utility interconnection and manages the full PTO approval process.24 That runs from submission to final approval.24 PTO means permission to operate. Our guide to solar back office outsourcing covers that side.

What should you hand a remote solar design team?

The same pack, for every job. A designer who must stop and ask loses a day across time zones. Send these seven things:

  1. Site photos and roof measurements.
  2. Main electrical panel details.
  3. Your equipment list, with exact model names.
  4. Your title block and sheet template.
  5. Rules sheets for that office and utility.
  6. Two sets that passed in that office.
  7. One contact who answers the same day.

When we run plan sets as a project, we ask you for the proposal, the utility bill and site photos.21 Senior QA checks every set.21

Before you commit, send any provider one finished job to redraw from the raw inputs. Compare it with the approved set. That is our advice for any provider. Our guide to hiring a remote CAD drafter covers the drafting standard and how to judge first sheets.

How do you check a returned set before you file it?

Check every set the day it returns. This table is our own list. Add the lines from your rules sheets.

CheckWhat to look atWho should catch it
Title block and notesAddress, system size and the code edition your office enforcesThe designer, then the reviewer
Site planArray layout, equipment and conduit runs, fire access paths and setbacks as your office writes themThe reviewer
Roof and structureMounting details match the roof data you sentThe reviewer, and an engineer where needed
Electrical diagramsThey match the equipment list and your utility’s rulesThe reviewer
Labels and signsEvery label your office and utility ask forThe designer
Spec sheetsOne for each model on the diagrams, spelled the same on every sheetThe designer
Stamps and lettersAttached when your office asks, from an engineer it acceptsYou and your engineer
Revision logSet number, date and a list of what changedThe designer, checked by you

Two people should check each set first. For a US-based solar EPC company, our specialists review electrical interconnection methods, structural information and technical plansets.22 They review before projects move into installation.22 When a planset needs changes, the reviewer writes revision notes, or makes the revision directly.23

Insist on the revision log. Every returned set carries a number and a list of changes. A set without one goes back unread.

Who stamps the plans?

Ask your permit office whether a set needs a stamp, and on which sheets. Penn State lists engineer stamps for electrical, mechanical or structural documents "if needed".10

Then book an engineer that office accepts. Agree how stamped sheets join the set, and who pays for changes after stamping. Our engineering page names drafting, review and permitting roles. It makes no stamp claim. None of this is legal advice. Check stamp rules with your office and your counsel.

How do you measure first-pass approval and turnaround?

Count the same four things for each provider, office by office:

  1. First-pass approval: sets approved with no comment, divided by sets submitted.
  2. Days from request to first return.
  3. Returns per set before you file.
  4. Days from filing to approval.

Never judge on the first alone. SurgePV says: "Avoid using first-pass approval as the only quality metric."12 It notes that a comment can come from "a design error, changed requirement, missing site data, or reviewer interpretation."13 So log the cause of each comment. A missing photo is a handover miss. Wrong wire sizing is a design miss.

We give no target figure here. We found no source to stand behind. Compare providers on your own offices, over the same months.

How fast does a set come back from a team in Indonesia?

Western Indonesia Time (WIB) is UTC+7.14 Indonesia does not use daylight saving time.15

Pacific Standard Time is UTC-8.16 So a 9 to 5 day in WIB runs from 6 pm to 2 am Pacific, the evening before. Eastern Standard Time is UTC-5.17 New York sees 9 pm to 5 am. None of it overlaps yours. How a team covers US hours anyway is in outsourcing to Indonesia.

Picture any provider on WIB daytime hours, and one complete job. You send it at 5 pm Pacific on a winter Monday, which is 8 am Tuesday in WIB. The designer works the WIB day. It ends at 2 am your time. The set is in your inbox before 9 am, with seven hours spare. In New York, the day ends at 5 am, four hours before you start.

In 2026, US daylight saving ran March 8 to November 1.18 In those months, add one hour.1625

This holds only for a one-day job with no open question. A question waits for your morning. So each question costs a full cycle. Batch your questions. Answer them in writing.

For clients in the United States, our teams work shifts aligned to US business hours. Get your hours in writing. Our time zone guide has city tables.

When does outsourcing permit design not fit?

Two cases argue against it. One is low volume in one office your designer knows well, where a remote team adds handover work. Another is layouts that change after the site survey on most jobs. Fix those inputs first. No designer can draw ahead of a moving roof plan. Ongoing volume, by contrast, suits offshore staffing with a dedicated designer.

And outsourcing moves only the drawing. You still own the final check and the stamp.

What does a remote permit design team cost, and how fast can it start?

A team with Eterna costs up to 75% less than hiring locally. The price depends on the roles and hours, so book a call for a quote.

A team starts in about a month. Week 1 defines the role and hours. In week 2 you interview and approve. Then they learn your tools. In week 4 the team works in your systems. You can start with one person.

The engineering service lists the roles for this work. They include PV designer (design & CAD), Solar design reviewer, Permitting coordinator and Permit expediter. Our solar industry page lists 55 roles in 6 groups. Everything your team produces is your property as work-for-hire. Every Eterna employee signs an NDA before they start on your account. How we work shows a team’s day and week.

For your busiest permit office, tell us the roles you need and how many people. We reply with a team plan by email within 24 hours.

Questions buyers ask

What should a solar permit package include?

It depends on the permit office. A Penn State course on commercial solar lists electrical drawings, the structural design, labels, a bill of materials and spec sheets.910 Engineer stamps come "if needed".10 Ask whether site surveys and utility applications sit inside the quote.

What should I give an outsourced solar designer?

Site photos and roof data, your equipment list and your template. Add a rules sheet for each permit office and utility, and two sets that passed there. Name one contact who answers the same day.

Who checks a plan set before it is filed?

Two people before you. In our engineering work, a drafter draws each sheet and a QC specialist checks it.20 We also staff the roles Solar design reviewer and Plan reviewer. Your own last look still comes before filing.

Does every solar plan set need an engineer’s stamp?

No single answer covers every office. Penn State lists engineer stamps "if needed".10 Ask your permit office which sheets need one. Then arrange it with an engineer that office accepts. Our site makes no stamp claim.

Is a remote design team cheaper than a local hire?

A team with Eterna costs up to 75% less than hiring locally. The price depends on the roles and hours, so book a call for a quote. A team starts in about a month, and you approve every hire.

Sources

  1. National Laboratory of the Rockies (NLR), Solar Permitting, Inspection, and Interconnection Timelines (updated 7 May 2026), on review time nlr.govReview and approval processes associated with the 20,000 distinct jurisdictions and 3,000 utilities can sometimes add weeks or months to the installation process
  2. NLR, Solar Permitting, Inspection, and Interconnection Timelines (updated 7 May 2026), on soft costs nlr.govnonequipment "soft costs" such as permitting, inspection, and interconnection remain stubbornly high
  3. NLR, Introduction to Residential Rooftop PV Permitting, training for the ICMA SolSmart program (2025), on what AHJs collect docs.nlr.govAHJs collect different information to complete plan review. Some communities require three-line diagram/electrical schematics, a site plan, and equipment installation instructions/cut sheets.
  4. NLR, Introduction to Residential Rooftop PV Permitting (2025), on code readings docs.nlr.govVariations in code interpretation and enforcement may result in plan review personnel requesting specific design modifications
  5. NLR, Introduction to Residential Rooftop PV Permitting (2025), on the codes AHJs enforce docs.nlr.govAuthorities having jurisdiction (AHJs) enforce codes, including the following: a. National Electrical Code (NEC / NFPA 70)
  6. NLR, Introduction to Residential Rooftop PV Permitting (2025), key codes for plan review docs.nlr.govKey model codes and standards underlying plan review. i. NEC Article 690, 705, and Chapters 1-4
  7. US Department of Energy, Streamlining Solar Permitting with SolarAPP+ (updated 15 May 2026) energy.govSolarAPP+ allows developers to check code compliance of designs before submitting them for permit approval.
  8. Penn State, AE 868 Commercial Solar Electric Systems, Permitting and Design Requirements, on the AHJ courses.ems.psu.eduLocal municipalities have final jurisdiction and authority for projects, so communicating with your Authority Having Jurisdiction (AHJ) and understanding permit requirements is going to be an important element of your job as a PV designer and installer.
  9. Penn State, AE 868, Permitting and Design Requirements, on the design package courses.ems.psu.eduThe city, utility, or AHJ might request a design package that complies with national and local standards. This may include: The conceptual package showing the overhead of the location of the PV system and the utility interconnection point. The one-line and three-line electrical drawings showing how the electrical connection between components is done and check electrical code compliance, such as NEC. The mechanical and structural design showing the load on the PV array and the holding structure.
  10. Penn State, AE 868, Permitting and Design Requirements, on labels, materials and stamps courses.ems.psu.eduWarning and signage that labels main parts of the PV system and provide guidance to utility personnel. Bill of material showing quantity and type of components used for the project. Official stamps by Professional Engineers (PE) for the electrical, mechanical, or structural documents (if needed). The specification datasheets for the main PV components.
  11. SurgePV, Outsourced Solar Design Services, EPC Buyer Guide (a solar software vendor; updated 4 November 2026), on coverage surgepv.comCoverage at one AHJ does not prove coverage at another, even within the same state.
  12. SurgePV, Outsourced Solar Design Services, EPC Buyer Guide (2026), on measuring quality surgepv.comAvoid using first-pass approval as the only quality metric.
  13. SurgePV, Outsourced Solar Design Services, EPC Buyer Guide (2026), on review comments surgepv.comAn AHJ comment can arise from a design error, changed requirement, missing site data, or reviewer interpretation. Track the cause and corrective action for each comment.
  14. Wikipedia, Time in Indonesia (UTC offset) en.wikipedia.orgWestern Indonesia Time (Waktu Indonesia Barat, WIB) is seven hours ahead (UTC+07:00) of the Coordinated Universal Time (UTC), used in the islands of Sumatra, Java, and the western half of Kalimantan.
  15. Wikipedia, Time in Indonesia (daylight saving) en.wikipedia.orgthe daylight saving time system is not observed anywhere in Indonesia
  16. Wikipedia, Pacific Time Zone en.wikipedia.orgPlaces in this zone observe standard time by subtracting eight hours from Coordinated Universal Time (UTC-08:00). During daylight saving time, a time offset of UTC-07:00 is used instead.
  17. Wikipedia, Eastern Time Zone en.wikipedia.orgEastern Standard Time (EST), which is five hours behind Coordinated Universal Time (UTC-05:00) and observed during late autumn and winter.
  18. NIST, Daylight Saving Time Rules (2026) nist.govDuring 2026, daylight saving time is in effect from March 8 at 2 a.m. (local time) to November 1 at 2 a.m. (local time).
  19. Eterna case study, CAD drafters, permit and utility coordinators for a residential solar company eternaindonesia.comSince 2024, Eterna has supplied Palmetto with CAD drafters, permitting coordinators and utility coordinators, and LightReach with QC and operations specialists.
  20. Eterna, Engineering service, the review before filing eternaindonesia.comA drafter draws each sheet, a QC specialist checks it, and a sheet with a fix goes back to the drafter before the permit package is filed.
  21. Eterna, Engineering service, plan sets as a project eternaindonesia.comCAD plan sets run as a project: send the proposal, the utility bill and site photos, and senior QA checks every set.
  22. Eterna case study, plan set review for a solar EPC company eternaindonesia.comEterna's specialists review electrical interconnection methods, structural information, and technical plansets before projects move into installation
  23. Eterna case study, revision notes on a plan set eternaindonesia.comWhen a planset needs changes, the reviewer writes revision notes, or makes the revision directly when that is the faster or more practical option.
  24. Eterna case study, utility work for a California residential solar company eternaindonesia.comfiling for utility interconnection, and managing the full PTO approval process from submission to final approval
  25. Wikipedia, Eastern Time Zone (daylight time) en.wikipedia.orgEastern Daylight Time (EDT), which is four hours behind Coordinated Universal Time (UTC-04:00) and observed during spring, summer, and early autumn.

Blog

More articles.

  1. Architectural drafting services: what to send and what comes back

    Architectural drafting services explained: what to send, what comes back at each stage, who checks it, and how revisions and files are handed over.

    • Engineering
    • Architectural drafting
    • CAD drafting
    • AEC
    • Outsourcing

    9 min readGlobal

  2. How to hire a remote CAD drafter: test real work, hand over your standard

    Hire a remote CAD drafter: what to test before you say yes, what to hand over on day one and how review keeps drawings right.

    • Engineering
    • CAD drafting
    • Hiring
    • Remote teams

    6 min readGlobal

  3. Quantity takeoff services: what you send and what you get back

    Quantity takeoff services explained: which drawings to send, what quantities come back, and how to check the work before your estimator prices the job.

    • Quantity takeoff
    • Construction estimating
    • Engineering outsourcing
    • AEC
    • Estimators

    8 min readUnited States

All articles

Next step

Talk to us about your team.

Tell us the roles you need, or book a 30-minute call. We reply with a team plan by email within 24 hours.